← Tope

Appliances

In progress Spend: -

1Cooling

SystemCruise N Comfort DC mini-split (VES Icebox UM), installed
Draw~45A DC continuous
ConnectionDedicated fused line from the Lynx

2Heating (planned)

Eberspächer combustion heater, to be mounted under a bench seat.

Open item: the exact model (D2, D4, D5, or Hydronic) is not confirmed. It sets the airflow and clearance specs, so it needs to be pinned down before finalizing cabinet ventilation sizing.

3Bed lift

Happijac electric system, repaired: broken set screw replaced, trolley re-seated, limit switch bypass confirmed functional.

The set screws act as sacrificial overload fuses. Replace with the exact original size and use blue threadlocker on reinstall. Stainless quick-release safety lock pins recommended as an add-on.