TopeLeave about Dec 1

Today

What can I do today

What you can do now, what's arriving, and the questions the plan is waiting on.

You can do these now in build order

Not on job lists yet: Grey water, Plumbing, Electrical, Control box, Lighting, The bed, Kitchen, Lounge, Roof rack, Underbody boxes, Slide-out deck, Awning, Air conditioning. They keep their old fixed order until they move over. All systems

Arriving

Waiting on you decide or measure

  • Which mixing valveits rough-in depth sets the mixer block in the lower wall · Shower
  • The cable bundle's depth off the cab plywoodthe cable box assumes 2 1/2 out · Shower
  • Does the 80/20 run over the flat 12 in of ceiling by the kitchenthe ceiling ribs' kitchen ends screw up into it · Shower
  • Which 80/20 series (1 in profile: 10 series?)sets the T-nut and bolt size for the braces · Shower
  • The bundle along the driver wall floor: how high, how deepsets the notch in each lower wall rib · Shower
  • The D1 latch: a slim pull, magnets and a flush boltthe parts to pick · Shower

Spend

 total so far, from the Tope ledger