← construction design

Shower construction details

Selected junctions only

Superseded bolt, sealing, curb, and direct-to-frame studies have been removed. These notes support the dimensioned details on the main construction page; they do not replace the current wedi manuals or written approvals.

1D1 simple frame and moving leaf

Opening edge

Keep the existing 31.5 x 76 x 1/2-inch partition plywood intact. Seal the exposed opening edge. After the full-size mockup, add only the small face-mounted stop and compression gasket plus local through-bolted latch backing. Do not rip off or replace a full-height hardwood strip, and do not rely on screws driven into plywood end grain.

Standard oak boards

At C use one standard S4S white-oak 1 x 2, actual 3/4 inch across the opening x 1.5 inches deep x 72 inches high, for the hinge upright. Use the remainder of the 8-foot board for the field-fit head, expected about 20.25 inches long. Use one standard S4S white-oak 1 x 4 project board for the dry-side bottom apron. The Wedi Lean Curb remains continuous directly behind the apron and is the waterproof threshold.

Moving leaf

Use 12 mm / nominal 1/2-inch, 9-ply Baltic birch at 19.5 inches nominal width. Do not add Wedi. Cut height only after the finished head and curb exist. On the shower face use the selected microcement manufacturer's approved plywood sequence: primer, full-face reinforcement mesh, flexible base coats, finish coats, and waterproof sealer. Seal the kitchen face, all edges, and every hardware hole. Do not bridge the hinge, sweep, latch pockets, or operating gaps with microcement.

Hinge and bottom

The Guden TS05050406-72 Type 316 continuous hinge stays inside the shower. Prove its permanent fastener pattern on the standard upright and Baltic-birch mockup before drilling. The door sweep lands over the sloped finished Wedi curb, not on oak. No apron, hinge, or latch fastener penetrates the curb top or wet face.

2Driver wall support

Layer or partConstructionLoad role
80/20Existing structural grid; verify projection, orientation, spacing and connection pointsPrimary structure
1/2 plywood furringInset between members or locally shimmed flush to one planePanel-edge and intermediate support
3/4 fixture blocksSpan and bolt to verified 80/20 at mixer, drop-ear, head/hook and accessoriesCarries plumbing and hardware loads
1/4 Baltic-birch skinContinuous lightweight plane over the support gridFlatness and layout only
1/2 wediMechanically fixed through the skin to approved structureWaterproof panel, not fixture backing

3Cab wall and bolt heads

Do not notch or pocket the wedi over the bolt heads. Measure every projection from the factory-plywood face. Select the thinnest actual overlay that finishes at least 1/16 inch beyond the tallest head. Drill local clearance holes in that overlay so it bears directly on the factory plywood around each head.

Fasten the 1/2 wedi through the new flat plane into verified cab structure. The overlay is not the primary structure. Above the 63.25-inch ledge, use scribed structural ribs and a matching skin to make one flat vertical wall plane; only its top edge is scribed to the curved ceiling.

4Curved ceiling backing

Keep the first 12 inches flat at 76.25, then transition into one smooth curve to 72 at the cab wall. The 14.335-inch radius is reference geometry only. Make a full-size shell template, cut paired 3/4-inch plywood profile ribs, bridge them with five clear transverse 1 x 2 battens at no more than 6-inch stations, and laminate two 3 mm BS1088 okoume skins over the profile.

Wedi hold: the later 1/2-inch ceiling panel is relief-cut to bend. Obtain wedi's exact written method for waterproofing over those cuts in this wet ceiling before cutting or installing it.

5Floor, wall and curb junction

PartCurrent detail
Existing finishThe measured 1/8-inch roll vinyl continues beneath the wardrobe and across the kitchen. Do not pull it from beneath fixed cabinetry. Score and remove it only beneath the Fundo and curb bond footprints; terminate and protect/seal the remaining sheet at the dry face of each curb or fixed wet-room boundary
DatumExposed structural birch subfloor = 0.000. Add 0.125 inch to an old height measured from top of vinyl when translating it to this datum, then field-check before cutting
Setting bedCement-based modified thinset, 3/16 to 5/16 inch compressed per the Fundo installation guide; full-coverage installation
Basewedi Fundo Primo 36 x 72 center point drain (US9100006) candidate; stock perimeter 1.578 inches
Drainwedi Fundo Click and Seal point drain; 2-inch Schedule 40 pipe cut flush with subfloor; 5-inch floor opening; cover flush with finish
Wall connectionSet the wall panel to the base per the selected manual and use wedi Joint Sealant at the Fundo/panel connection
Curbwedi Fundo Shower Curb Lean 60 (US3000038), 3.5 high x 2 wide, factory sloped inward
FinishOnly the written, approved microcement primer/reinforcement/base/finish/sealer system; preserve slopes and gasket lands

No floor cut yet. Confirm drain X/Y, underside clearance, pipe fall, support, trap/reducer and service access first.

6D2 rail, guide and seals

7Fan, porthole and drying penetrations

PartCurrent detail
FAN12High on the flat front wall and outside direct spray. Interior face 5.125 inches, wall cut 3 inches, fan depth 2.375 inches. The fan remains removable from inside without disturbing finish.
Fan blockingProvide a structural ring around the cut. A straight rigid 3-inch sleeve crosses the wall with a slight outward fall. Mechanically support the fan and cowl; do not ask wedi or microcement to carry them.
Fan waterproofingSeal the wedi continuously to the rigid sleeve before microcement. Keep bedding and fasteners serviceable. Confirm the selected sealants are compatible with the sleeve, cowl base, wedi and exterior shell.
SCIROCCO cowlMount vertically with mouth downward. At the measured 3.5-inch wall-to-box gap, its approximately 2-inch projection leaves about 1.5 inches nominal. Use a fixed bumper and prove at least 1 inch actual clearance with straps and hardware present.
PW201P portholeApproximately 7.80-inch exterior frame and 6.85-inch cut. Build a structural sleeve/tunnel to a verified clamp plane, block the plywood cutout, waterproof the wedi to the sleeve, and slope the bottom reveal into the shower. No exposed wood remains.
Make-up airProvide a protected transfer path through or around D1/D2 so the 41 CFM fan works with the porthole closed. The opening porthole is additional parked ventilation, not the only inlet.
Drying hardwareHold DS-wall bars 1.5 to 2 inches off the finish. Keep secondary hooks above D2 clear of the top rail, parked leaf, fan, porthole and direct spray. Hooks hidden behind an open D1 are storage only, not the primary drying zone.

8Approval boundary

Details still requiring written manufacturer direction: 1/4 wedi over the kitchen plywood and wardrobe; mechanical attachment through thin support skins in a moving vehicle; exact US9100006 trimming; the complete microcement-over-wedi system; any 2-to-1.5 trap transition; and VETUS acceptance of the FAN12 location and closure/backdraft strategy.