Systems / Water / Shower

Shower

wedi floor and walls, the swing door to the kitchen, the slider to the cab, microcement.

18 TBD · 42 ready to order · 9 ordered · 10 have it · update parts on your phone

Prove it, write down what was actually built, and close it out as a journal entry.

Tests

Prove it holds water and survives the road. Tap a test to see what it checks.

Flood test the waterproofing

Plug the drain, fill the base to just under the curb tops, leave it 24 hours. Check underneath, in the cab and behind the wardrobe.

Hose the walls

Spray every wall, the D2 seals and the D1 gasket. Nothing behind or below.

Drain test

Run the shower 10 minutes: the floor drains dry, nothing pools. Park on a slope and repeat.

Door cycles

Open and shut both doors twenty times: no rub, latches catch every time, D1 stops at about 78 degrees.

Fan and cowl

Fan on its timer; hose the outside of the cowl: nothing drips in.

Washboard road

Drive a rough road with everything latched. Listen for rattles; check the doors, the track stops and the hinge screws after.

One week later

Re-check the latches, hinge screws, track stops and every sealant line.

Snags

Anything that needs fixing after the tests: tell Claude, or add it in the tracker's notes, and it goes here with the step that fixes it.

As built

The numbers the shower was actually built to, from the tracker. They replace the design numbers everywhere once measured.

Cab wall bolt heads

drawn at about 1/4

as built not yet

Room width at 3 heights

drawn at 52 1/2

as built 52 1/4 at all three heights

Room depth at 3 heights

drawn at 22 3/16

as built 21 1/4 at all three heights (partition built)

Floor diagonals

drawn at

as built 56 and 56: square

80/20 on the driver wall

drawn at

as built faces line up: straight and plumb on the driver side (straightedge)

The cab passthrough

drawn at 27 3/8 x 39, assumed at the wardrobe end

as built 27 1/2 x 39 1/8; starts 1 3/4 behind the wardrobe face (toward the passenger wall), so the wardrobe shows from the cab: that strip needs filling

Upper cab band

drawn at 5/8

as built not yet

Ceiling heights

drawn at 72 to 76 1/4

as built 76 at the kitchen wall, flat about 12 in, then curves down to 70 1/2 at the cab wall

The partition opening

drawn at 21

as built not yet

The fan zone

drawn at 30 from the wardrobe, 66 1/2 up, behind the Pelican box

as built not yet

Wardrobe top and the cubby

drawn at ply ceiling 75 1/2, gap 3 3/8 at the front (Jeff): wardrobe top 72 1/8; 8020 at 76 1/4 behind the ply. Middle and back still to tape

as built not yet

The vinyl

drawn at 1/8

as built about 1/8

Mark the drain

drawn at

as built pilot at 20 from the driver 80/20, 12 1/2 from the cab plywood; below: about 3 in behind the crossmember and 3 in from the frame rail, clear

Where the shower goes

drawn at mixer 40 up

as built not yet

Close it out

With the tests passed: photos of each stage, the receipts, and the as-built numbers become the shower's journal entry, like The bed, as built.

Tap a test to see what it checks.