The bed on the Happijac lift: frame, headboard, LEDs, pucks, the drag chain.

3 TBD · 20 ready to order · 2 ordered · 15 have it · also: Board shop drawingsBed manual (first build)Routing the channels

Frame, boards, rails, the slot, LEDs, pucks, wiring, the headboard. The drawing follows the steps.

Build

Every step in order. Scroll and the drawing follows: it builds up to the step you are on and lights what that step adds.

Prep step 1

1

Check before you start

  1. Calipers on the channel: 16.93 mm wide, so one 1 11/32 groove takes both; caliper the height with the cover on for the depth. The warm strip is in hand; the RGB reel, pucks, chain and cable arrive first.
  2. Pick the control box's cabinet; that sets the cable length.
  3. Tick off whatever is already done: the struts, the deck, any cut boards.

Frame step 2

2

Pull the dry fit, then struts and deck for real

  1. Take out the dry fit and the scrap pine mock-up. Keep the pine: its notches are your templates for the poplar.
  2. Struts flat across the two black rails: the back one tight in front of where the back 1x5 goes, the front one flush with the deck's front edge, the middle two under the deck seams.
  3. One 1/4-20 x 3/4 per strut end, up through the rail and the strut's bottom wall, nut inside through a 1/2 in access hole in the strut top. Anti-seize.
  4. Diagonals equal within 1/8. Cycle the lift once, slowly: the struts clear the spools, the motor and the drive shaft.
  5. Deck: three sheets 76 7/8 long, seams on the middle struts, felt tape on the strut tops, #10 x 3/4 into every strut about every 12 in.

Tip Mark each strut's position and which end faces the driver side before you pull them, so the holes line up again.

Boards steps 3 to 8

3

Cut and notch the boards

  1. Head: 1x10 ripped to 8 1/2, 60 3/4 long, 8 1/2 tall. Foot: a 1x5, the same length. Back 1x5: 78 3/8 long. Inner back wall: a 1x5 ripped to 3 1/2, 76 7/8 long, notched at the motor end down to 2 1/8 tall. Spacer strip: 1 1/8 x 1/2, 76 7/8 long. Front: white oak, 78 3/8 long, ripped to 4 1/2.
  2. Strut notches underneath the head and foot (3 x 1 1/2 at each strut); top notches for the spools, the drive shaft and the motor; the back 1x5's motor notch.
  3. Every cut, from one end, is on the shop drawings. Round the inside corner of every notch to a 1 in radius.

Tip Rout the LED grooves (next step) before you cut the top notches: the router runs full length, the notches then end the grooves cleanly.

Rails steps 4 to 5

4

LED rails: the grooves

  1. One groove on the outside face of the head, the outer back 1x5 and the foot, 1 11/32 wide (two 16.93 mm channels side by side), 5/16 deep, from 2 5/32 to 3 15/32 up from each board's bottom: centred between the strut notches and the motor notches, so both channels run full length, one line round the frame. 1/2 in straight bit, one pass hard against each rail of the jig, two depths; try it on scrap with a channel pressed in.
  2. Head -1 -1/4 to 59 1/2 from the back, foot -1 -1/4 to 59 1/2, back 1x5 0 to 78 3/8 from the driver end: every full-height stretch.

Tip Shop drawings (bedlights-boards.html) have every groove, notch and hole from one end. The notch drawing on the Overview shows where each groove stops. Rout full length first, then cut the notches; if they are already cut, stop just inside each one and square the ends with a chisel.

5

Wire rails and holes

  1. At each run's start (the back end of the head and foot; on the back 1x5, 1 1/4 from its driver end, just past where the head board butts it), a 3/16 hole from the groove bottom through to the inside face.
  2. Inner back wall: a 3/8 crossing hole 7/8 up from its bottom, 1/2 in from its driver end. The head run's holes (1/2 in from the head board's back end) and the back run's holes both come out into the slot's driver end: the leads drop to the slot floor in short lead grooves, cross the 1 1/4 in together, and go through it. (2026-10-12: the junction box now sits in the slot's driver end, so the leads stop there; the crossing hole is only for the foot run's lead or a far-end feed coming in.)
  3. Wire rails, 1/4 x 1/4, on the INSIDE faces: along the foot board 1 1/4 below its top, from its holes to the back end; and the full length of the inner back wall 1 1/2 in up from its bottom, low enough to pass under the motor notch. The foot run's leads ride them to the driver corner, stepping down 1/4 at the corner.
  4. A 1/4 deep pocket chiselled where each pair of holes comes out, joining them (and the foot's to its rail). Vertical lead grooves: on the head board's and the back 1x5's slot faces, from the pocket down to the slot floor; on the inner wall's mattress face from the rail down to the deck, past the crossing hole.
  5. Pucks: a 3/8 hole at each. In the deck top, a 1/4 groove from each puck straight back (parallel to the head board) to a cross groove 4 in in front of the inner wall; the cross groove runs to 1 1/2 in from the head board, then a short groove straight back under the inner wall's 3/8 notch into the slot, where the junction box is. Slack loop at each deck seam; no screws in the groove lines.

Boards steps 6 to 8

6

Paint the boards, oil the front

  1. Poplar boards (head, foot, back 1x5, inner wall): sand 150 then 220, ease every edge and notch corner. Dry-assemble once more before paint.
  2. One coat of shellac primer, a light 320 scuff, then two coats of grey satin enamel. Paint all faces and the notches, so the boards stay flat.
  3. The oak front: sand 150, then Rubio Monocoat Oil Plus 2C (Pure): mix the two parts, rub on a thin coat, wait 5 minutes, wipe ALL the excess off. One coat is the finish.
  4. The struts' veneer: the same oil, so they match the front. Hand-sand lightly at 180 first, never a power sander: the veneer is only 10 mil.
  5. Keep it off the paint and work in a warm place: it cures in about 3 days (full in 7), so keep the mattress off it until then.
  6. The deck underside is the office ceiling: sand it and paint it or seal it to suit.

Tip Mask the LED grooves and the wire rails before you prime: the channels' silicone wants bare wood, and paint in a 1/4 rail makes the leads stick.

Slot step 7

7

The back slot

  1. The back 1x5 on the rails, flush with the rail ends, tight against the back strut, full width. Three small angles in the slot hold it: upright leg on its inside face, flat leg on the spacer strip (next), screwed through it into the strut.
  2. Deck panels in, pushed to the front: each is 19 7/8, so the seams land 19 7/8 and 39 3/4 back from the oak front's inside face. Centre the two middle struts under them.
  3. The 1 1/8 gap behind the back panel gets a spacer strip, 1/2 in thick, screwed to the back strut: the slot floor, level with the deck. Easier than cutting a panel.
  4. The inner back wall on the deck, 1 1/4 in in front of the back 1x5. The gap between them is the slot: 1 1/4 wide, 2 1/2 deep to the outer 1x5's top.
  5. Felt in the slot floor. It holds a phone, a Kindle, a sleep mask: at full up the drive shaft passes over it, so nothing taller than about 3 9/16 in.
  6. The head and foot boards (next step) close its two ends; a small angle in each end corner ties them to the back 1x5.

Caution Nothing may stand above the back 1x5 in the slot: the drive shaft spins over it at full up.

Boards step 8

8

Head, foot and front

  1. Head and foot boards down onto the rails, the struts through their notches, from the back 1x5 to where the front goes.
  2. Two corner braces inside every corner, one high, one low; braces from each board's inside face down onto the deck. #8 x 5/8 into the boards, #8 x 1/2 into the deck.
  3. The oak front across the front strut and the deck edge, braced into the head and foot boards, screwed into the strut every 8 in.

Caution No glue anywhere: it all comes apart with a screwdriver.

LEDs steps 9 to 10

9

Channels and strips

  1. A thin bead of clear silicone in each groove, the channels pressed in flush.
  2. Warm strip in the top channel, RGB in the lower one, each run starting at its back corner end. Diffusers on, end caps.
  3. Corners: cut on the cut line, don't bend. A strip-to-wire clip on each end (2-pin 10 mm on the warm, 4-pin 10 mm on the RGB), joined by 8 to 12 in of wire folded behind the board: + to +. Test every colour, then a dab of hot glue over each clip.

Caution Nothing may stand proud into the 1/2 in to the columns.

10

Leads into the wire rails

  1. Solder or clip a lead to each strip's start: 2-core warm, 4-core RGB. Through the 3/16 hole to the inside face.
  2. Head and back runs: into the slot's driver end and straight into the junction box (port A). Foot run, or a far-end feed: along the wire rail across the back, through the inner wall's crossing hole into the box (port C). Leave a foot of slack coiled at each.
  3. Foil tape over the wire groove.

Pucks steps 11 to 12

11

Pucks

  1. Screw the 4 pucks under the deck at their holes, wires up through.
  2. Lay the wires in the deck grooves, foil tape over, and down through the hole near the back edge to the junction.
12

The fans, one in each front corner

  1. In the front bay, between the third strut and the front one, an inch in from the foot board for fan 2 and from the head board for fan 1: drill a 3/8 hole up through the deck beside where each base goes, on its inboard side.
  2. Groove the deck top from each hole straight back to the cross groove, like the pucks'.
  3. Screw each Sirocco's base to the deck underside: #8 x 1/2 at most, or it comes through the deck top. Set the heads angled in toward the middle.
  4. Each lead up through its hole, back along the grooves, foil tape over, under the inner wall into the junction box (port B). Mark them FAN1 (driver) and FAN2.
  5. Folded, it lies flat between the struts. Measure its folded depth: over 1 1/2 and it stands below the struts' bottom, so check what it meets with the bed all the way down.

Caution Fold it flat before lowering the bed.

NeedsReady: everything is in hand
Caframo Sirocco II 12 V gimbal fans, x2have it

Wiring steps 13 to 16

13

Junction box

  1. Print the box: 9 x 1 1/8 x 2 1/4, lid on top. It sits in the back slot's driver end, against the head board.
  2. Drill the head board at the slot's end: a 1/2 hole, centre 4 up from its bottom edge, above the LED channel. The cable goes out there, straight into the drag chain.
  3. Notch the inner wall's bottom edge 3/8 x 3/8 over the deck's cross groove: the puck and fan wires pass under it.
  4. Wagos, as drawn: three 5-ports jumpered for +12 (warm +, RGB +, fan 1 +, fan 2 +, the pucks' joined + and three cable cores); one 5-port joining the four pucks' +; a 2-port each for warm, R, G, B, fan 1 and fan 2; a 5-port each for the pucks' four whites and four reds; the spare core capped in a 2-port.
  5. Touch each puck's two colour wires to 12 V first and mark which is white and which is red.
  6. Zip-tie every bundle at its port, 6 in of slack inside, label every wire at both ends. Lid on.

Tip The overview's junction box drawing: hover any wire to see where it goes.

14

Drag chain in the rear corner

  1. Out of the junction at the back corner, through the head board's back notch, into the corner behind the back Happijac column: between the driver wall and the bed, toward the rear wall.
  2. The chain hangs in a U: moving end bracketed low on the head board's outside face at its back end (below the notch, where there is no LED channel), fixed end bracketed in the corner at mid-travel, about 20 3/4 above the bed-down rail line.
  3. Turn it so the U runs along the driver wall (fore and aft), its fixed leg tight in the corner. Nothing crosses behind the bed's back edge: that inch is flex space.

Caution Cycle slowly and watch the loop the whole way: nothing may touch the trolley or the chain drive.

15

Along the side to the control box

  1. From the fixed end: down to the floor, forward along the driver wall behind the bench, clipped every foot, and up into the aft kitchen upper.
  2. Grommets wherever it passes through a panel.
16

Controller, fuse, switch, button

  1. The QuinLED in its printed box in the cabinet. The three +12 cores on one Wago to its + out; the eight returns into channels 1 to 8; the spare capped.
  2. 12/2 from the DC box's Lights A position: + through its 20 A fuse there and master rocker A on the box; - to the negative bus, load side of the shunt (lighting-overview.html, the control box).
  3. Channels 1 to 8: warm, red, green, blue, pucks white, pucks red, fan 1, fan 2 (7 and 8 switch fully on, never dimmed). Turn on ESP-NOW in WLED and pair the WiZmote (press a button, add its address); its holder goes up in the lounge.

Headboard steps 17 to 18

17

Make the headboard

  1. Cut the 1/2 in ply 55 3/4 x 13 1/2. Ease the edges.
  2. White oak veneer on BOTH faces with solvent contact cement, the same as the struts: one face alone pulls the panel into a cup. Roll it hard, trim flush, ease the edges with 180.
  3. Rubio Monocoat Oil Plus 2C, Pure, one coat wiped off: it matches the struts and the oak front. Paint or oil the edges.
  4. Plane the head board's top 4 degrees along the headboard's stretch, low on the wall side: it then leans back a little and its weight holds it upright.
18

Hang it

  1. Stand it on the head board's full-height stretch, 1 1/4 to 57 from the back, clear of the front notch.
  2. Four hinges, knuckle on the board's INBOARD top edge, evenly spaced (shop drawing): it can only fold forward, onto the mattress.
  3. A locking lid support at each end, inboard: clicks rigid upright. Press the elbow to fold it.
  4. Folded, it lies flat on the mattress. Try Fold the headboard in the 3D.

Caution Fold it before the bed goes up: upright it hits the ceiling. Raise the bed in the 3D folds it first.

Commission step 19

19

Test it

  1. Every test on the Test page, then the mattress back on.