Shower
This page is intentionally short. The previous overview mixed old assumptions with current decisions. The construction page below is now the authority for dimensions, wall stacks, doors, floor, drain, build order, and purchases.
Complete construction design and purchase gates: Shower build-up →
Current release order: Shower sequence →
1Current design
| Element | Current design | Status |
|---|---|---|
| Envelope | 52.5 wide x 22.1875 deep at the wardrobe front | Measured |
| D1 | Keep 31.5 x 76 x 1/2 partition plywood intact; standard oak 1 x 2 upright/head and 1 x 4 dry apron; 19.5 x 12 mm 9-ply Baltic-birch inward leaf with no Wedi; Guden 316 continuous hinge | Boards, leaf stock and hinge released; microcement sequence, final height and seals held |
| D2 | 19 x 3/4 wet-side slider over 18 clear; Husky hanger pack and uncut 4-ft track | Mechanism after compatibility check; track cut and height held |
| Ceiling | 12 flat at 76.25, then a smooth scribed curve to 72 | Dry ribs/skin defined; Wedi cut-waterproofing method held |
| Floor | Fundo Primo 36 x 72 center point-drain candidate, US9100006 | Not released |
| Drain | wedi Click and Seal 2 in point drain; candidate X = 20, centered Y | Exact center and underside route not confirmed |
| Curbs | wedi Lean Curb, 3.5 high x 2 wide, item US3000038 | Product selected; cut plan held |
2The room, to scale
Measured 2026-08-23. Before that the only figure was an assumed 32 by 24, so this room had never been drawn.
Red is unresolved: both opening sizes and positions, and the corner A radius that gets built out square. Green is the finished envelope. The driver wall framing at 2 is a RECOMMENDATION, not a measurement, and it is the last number holding up the finished width.
3Project pages
4What is not confirmed
Do not cut the final door leaves or floor yet. The D1 hinge and D2 mechanism may be purchased at their stated gates. The drain still requires exact X/Y, chassis clearance, a supported 2-inch waste route, fall, trap/reducer arrangement, and service access from below.
- Actual driver-wall 80/20 projection, spacing and fixture blocking map.
- Maximum cab bolt projection and full-size upper-cab/curved-ceiling template.
- Delivered D2 trolley geometry, BG1 guide, final track cut and seal profiles.
- Written wedi attachment/bond instructions for the vehicle substrates.
- Written approval for one complete microcement system over wedi.